Dec 12, 2024
New 32mm Water Connection
New 32mm water connection, moled carriageway, 200mtrs of water pipe track, installed primary and secondary boundary boxes, took pipe into...




Jan 27, 2024
Water and Electricity services
Water and Electricity services ensuring separation.


Jan 24, 2024
Water service install
Water service install for new development in some challenging ground. Boundary box and non return valve install.


Jan 23, 2024
Site servicing, water and power tracks.
Site servicing, water and power tracks.




May 1, 2023
Standpipe install
Water Supply to Temp Stand pipe on new site. Remote track inspection procedure, complying with SW by-laws.


Apr 30, 2023
Utility boreholes drilled
We drilled 3 boreholes last week for water supplies, 36 meters (118 feet) deep. The supply of pipes, cables and commissioning works to...


Jan 16, 2023
Water connection
Water Connection reinstated at a Moling job that we did before Christmas, 9.5mtr moling below the A836 Carriageway for a 32mm water...