SSG GroundworksJan 28, 2024New Path and StepsNearly 200 slabs around this house, and 18 steps in total, log store bases. Removed old concrete path, installed stone drains, deveg, installed Terram and hardcore, slabbed all round. Lots of material hauled in and out.
Nearly 200 slabs around this house, and 18 steps in total, log store bases. Removed old concrete path, installed stone drains, deveg, installed Terram and hardcore, slabbed all round. Lots of material hauled in and out.